Production 1   Department

Mainly producing normal bends.

The main progress of work is cutting, tapping, bending, and C.N.C rack processing, which produce normal bends, coupling, nipple, reducer, and others.

 

Production 2   Department

Mainly producing lock nuts.

The main progress of work is punching, drawing, tapping processing by press and tapping facility with main materials, steel sheet, which produce lock nuts, saddle, half saddle, U-saddle, clamp, cover, and others.

 

Production 3   Department

Mainly producing surface switch boxes.

The main progress of work is forming processing, tapping by die casting machine with zinc alloy die casting and aluminum alloy die casting, which produce surface switch boxes, universal, circular surface boxes, surface consent boxes, bushings, insulated bushings, and others.

 

 

 

     

Copyright(c)2000~ JE IL METALLIC IND.CO.,LTD. All rights reserved.

webmaster@jimetal.com

Powered by webtro